Job Work · Duplex & Stainless

Duplex, Super Duplex & Stainless Steel Fabrication Job Work

Duplex and super duplex are unforgiving. Too much heat and the ferrite balance shifts — and with it the corrosion resistance the material was bought for, often without any visible defect. HAIL’s Kalol workshop fabricates duplex 2205, super duplex 2507, SS 304/316/316L and impact-tested LTCS under procedures written for exactly that risk.

Duplex 2205Super duplex 2507SS 304 / 316 / 316LLTCS SA 333 Gr.6Ferrite verifiedPMI on every weldment

Why duplex goes wrong — and how we control it

A duplex weld can pass visual inspection and dye-penetrant testing and still be the wrong metallurgy. Excess heat input or a high interpass temperature upsets the austenite–ferrite balance and can precipitate intermetallic phases; nitrogen loss from the root weakens pitting resistance. The defect is in the microstructure, so the controls have to be in the procedure:

RiskControl at HAIL
Phase imbalance from heatControlled heat input, written into the WPS
Overheating across passesControlled interpass temperature
Ferrite outside the specified rangeFerrite number verification on the weld
Nitrogen loss in super duplex rootsNitrogen-backed purge gas for super duplex welds
Wrong material in the jobPMI and mill test certificate traceability on every plate and weldment

Materials we fabricate

MaterialTypical service
SS 304 / 316 / 316LChemical and pharmaceutical equipment, process piping
Duplex 2205Chloride-bearing and seawater service
Super duplex 2507Severe chloride and seawater service
LTCS, SA 333 Gr.6Ammonia and cryogenic piping, with impact-tested weld procedures

What we make in these materials

Pressure vessels, columns, drums and heat exchangers; pipe spools to ASME B31.3, B31.1 and B31.4; process skids; and precision stainless parts for rolling stock — including SS underframe parts, bogie brackets and gangway frames for railway and metro coaches. Pressure vessels can be built under the workshop’s ASME U-Stamp.

Testing and documentation

How to get a job-work quote

Send the drawing and we will come back with a budgetary price and a slot. The fastest route is the form at the foot of this page, or WhatsApp the drawing to +91-95100-34854, or email it to info@hail.ltd. A useful enquiry tells us:

Who sends us this work

EPC contractors and equipment manufacturers with a duplex or stainless package and a schedule that cannot absorb a weld repair; process licensors who need a fabricator that will follow their procedure rather than improvise; and rolling-stock suppliers who need precision stainless parts to tight tolerances. If the job has been turned down elsewhere because of the material or the size, that is a good reason to send it to us.

Frequently asked questions — duplex and stainless steel fabrication job work

Do you fabricate duplex and super duplex stainless steel?

Yes — duplex 2205 and super duplex 2507, with controlled heat input, controlled interpass temperature, ferrite number verification and nitrogen-backed purge gas for super duplex welds.

How do you make sure the right material is used?

Every plate and weldment carries PMI and mill test certificate traceability, and ferrite is verified on duplex welds. The records go to you with the job.

Do you fabricate SS 316L for pharmaceutical and chemical equipment?

Yes. SS 304, 316 and 316L are routine at the Kalol workshop for chemical and pharmaceutical equipment and process piping.

Is radiography done in-house?

Welds are made to 100% radiography quality; radiography itself is carried out by an approved NDT agency. Dye-penetrant, hydrostatic, pneumatic and dimensional testing are done in-house.

Can you build ASME U-stamped pressure vessels as job work?

Yes. The workshop operates under ASME U-Stamp certification for pressure vessels, with ASME Section IX qualified welders and procedures.

Do you work in low-temperature carbon steel?

Yes — LTCS to SA 333 Gr.6 for ammonia and cryogenic piping, with impact-tested weld procedures.

Have a duplex or stainless package?

Send the drawing, material grade and inspection requirements. An engineer reviews the procedure needs and replies with a price and a slot.

  • Engineering review and budgetary estimate within 24 hours
  • Scope, schedule and mobilisation plan — not a sales call
  • No obligation; your details stay with HAIL’s engineering team
Request a budgetary quote

Four fields. An engineer replies, not an autoresponder.